Pengurusan Kejuruteraan

PENGURUSAN PROJEK: THESIS AND JOURNAL

1.                   SISTEM MAKLUMAT PENGURUSAN PROJEK PEMBINAAN YANG DISELIA OLEH PIHAK BERKUASA TEMPATAN NEGERI JOHOR DARUL TAKZIM. (MOHAMMAD SAIFUL NIZAM BIN SAAD)

2.                   PENGURUSAN KUALITI DI TAPAK BINA: KEPERLUAN DALAM KERJA-KERJA PEMBINAAN. (NAVARUBAN A/L KISHNAN)

3.                   PENGURUSAN PROJEK DI DALAM PEMANTAUAN PENJADUALAN KERJA KAJIAN KES PROJEK PEMBINAAN DI PUSAT TEKNOLOGI UTM. (MUHAMMAD ADAM BIN ABD KADIR)

4.                   PENGURUSAN SISA PEMBINAAN DI TAPAK BINA. (Seow Ta Wee & Abdul Halim Bin Mohamad)

5.                   PEMBANGUNAN BUDAYA KESELAMATAN DALAM INDUSTRI PEMBINAAN. (Mohd Saidin b. Misnan & Abdul Hakim b. Mohammed)
               
6.                   PENGURUSAN SISA PEMBINAAN OLEH KONTRAKTOR. (MOHD AZRUL BIN ZAINAL ABIDIN)


7.                   KAJIAN MENGENAI PUNCA KEMALANGAN DI TAPAK PEMBINAAN DI ZON UTARA SEMENANJUNG MALAYSIA. (Mohd Zahari bin Nordin)

8.                   PEMBOLEH PROSES PENYEDIAAN PERANCANGAN PROJEK PEMBINAAN. (Norhanim Zakaria)

9.                   KOS KESELAMATAN DALAM PROJEK PEMBINAAN BANGUNAN. (NUR ZARIFAH BINTI HARUN)

10.               KELEWATAN MENYIAPKAN PROJEK-PROJEK PERUMAHAN : KAJIAN DI NEGERI PERLIS. (Mazlan Ismail, Mohd Nazaruddin Yusoff & Dani Salleh)

11.               CONSTRUCTION PLANNING AND SCHEDULING : A CASE STUDY OF  “CADANGAN MEMBINA DAN MENYIAPKAN KULLIYYAH SAINS UNTUK UNIVERSITI ISLAM ANTARABANGSA MALAYSIA. (Mohd Khalil Bin Abdul Kadir)

12.               KOMPOSISI DAN KOS SISA PEMBINAAN BAGI PEMBINAAN KUARTERS F, BALAI BOMBA DAN PENYELAMAT  DITAMAN UNIVERSITI, SKUDAI, JOHOR BAHRU. (MUHAMMAD IKRAM BIN ISHAK)




KONTRAK , PENGUKURAN KUANTITI & UKUR TANAH: THESIS & JOURNAL

1.                  ARAHAN PERUBAHAN DALAM PROJEK PEMBINAAN JALAN RAYA. (Che Shazwani Bt Che Johan)

2.                  KAJIAN TERHADAP UNDANG-UNDANG YANG BERKAITAN DENGAN KONTRAKTOR BINAAN. (WAN MOHD RIZAIDI BIN WAN MAT)

3.                  PRINCIPLES OF KNOWLEDGE TRANSFER IN COST ESTIMATING CONCEPTUAL MODEL. (KOH CHEW LENG)

4.                  BUILDING STRUCTURAL QUANTITY MEASURING ALGORITHM USING  DRAWING ELEMENT RECOGNITION IN TWO-DIMENSIONAL STRUCTURAL  DRAWING. (CHITRAKALA MUTHUVEERAPPAN)

5.                  PERTELINGKAHAN DALAM PEMBINAAN : KAJIAN TERHADAP TUNTUTAN DAN PEMBAYARAN SEBAGAI FAKTOR PENYEBAB. (AHMAD AZAHRI BIN AWANG)

6.                  MENANDA ARAS KEMAJUAN SISTEM UKUR KADASTER BERASASKAN KADASTER 2014-PERSEDIAAN JUPEM KE ARAH MENJAYAKAN KADASTER 2.0. (Sr Dr. Teng Chee Hua, Sr Chan Keat Lim, Sr Nur Zurairah Binti Abdul Halim)

1)     POTENSI JERAMI PADI SEBAGAI BAHAN BAKU PANEL AKUSTIK- Christina E. Mediastika

2)     KOEFISIEN PENYERAPAN BUNYI BAHAN AKUSTIK DARI PELEPAH PISANG DENGAN KERAPATAN YANG BERBEDA- Evi Indrawati, M. Tirono

3)      STUDI PENERAPAN SISTEM AKUSTIK PADA RUANG KULIAH AUDIO VISUAL- Indrani, Hedy Constancia And CAHYAWATI,

4)    KUALITI PERKHIDMATAN FASILITI HOSPITAL KERAJAAN DARI PERSEPSI PENGUNJUNG (KES KAJIAN: UNIT KECEMASAN DAN KEMALANGAN, HOSPITAL KERAJAAN, SARIKEI, SARAWAK) - Mohd. Ali, Hishamuddin and Baba, Maizan (2005)

5)     AUDIT TENAGA BAGI SISTEM PENGUDARAAN DAN PENYAMAN UDARA UNTUK BANGUNAN AKADEMIK-Shahrulnizam , Mohd Ishak (2006)

6)      PENENTUAN TEMPOH SELENGGARAAN OPTIMUM BAGI SISTEM PENGHAWA DINGIN DI BANGUNAN FAKULTI KEJURUTERAAN MEKANIKAL - Nur Alwani, Hashim (2009)

7)      KAJIAN PEMBAHAGIAN ALIRAN TENAGA UNTUK PENGGUNAAN TENAGA CEKAP- Mohd Fauzi, Ab Rahman (2009)

8)      STUDI OPTIMASI SISTEM PENCAHAYAAN RUANG KULIAH DENGAN MEMANFAATKAN CAHAYA ALAM- Chairul Gagarin Irianto

9)     A LIGHTING CONTROL SYSTEM IN BUILDINGS BASED ON FUZZY LOGIC.- Panjaitan, Seno D.; Hartoyo, Aryanto

10)   SISTEM PENCAHAYAAN ALAMI PADA BENTUK DAN TATA RUANG KOTA LAMA SEMARANG  KAITANNYA DENGAN JARAK DAN TI142GI BANGUNAN- Paramita, Beta (2003)

11)  OPTIMASI SISTEM PENCAHAYAAN DENGAN MEMANFAATKAN CAHAYA ALAMI  (STUDI KASUS LAB. ELEKTRONIKA DAN MIKROPROSESSOR UNTAD)- Nurhani Amin

12)  PENILAIAN KRITERIA GREEN BUILDING PADA GEDUNG TEKNIK SIPIL ITS- Aristia A. Putri, M. Arif Rohman, Christiono Utomo

13)    AUDIT SISTEM KESELAMATAN KEBAKARAN DI BANGUNAN PANGGUNG WAYANG. KAJIAN KES: CATHAY CINEPLEX BUKIT JAMBUL DAN CATHAY CINEPLEX PRANGIN MALL, PULAU PINANG - Mohd Dzulkarnaen Sudirman, Sr. Mohd Azlan Zaidi and Ahmad Zaril Muhd Jamal

14)   SISTEM PENGAUTOMATAN PEMBUKAAN JERIJI KETIKA KEBAKARAN - Sulaiman, Mohd. Sufyan (2009)

15)  STUDI TINGKAT KEANDALAN SISTEM PROTEKSI KEBAKARAN PADA BANGUNAN APARTEMEN (STUDI KASUS APARTEMEN DI SURABAYA)- Adiwidjaja, Roy

16)  KEPENTINGAN PENGETAHUAN DAN KEMAHIRAN TENTANG PENGGUNAAN ALAT SISTEM KESELAMATAN KEBAKARAN DI MAKMAL KEJURUTERAAN AWAM KUITTHO- Tang , Hing Kwong (2002) Link add - http://eprints.uthm.edu.my/692/

17)  KEARAH PENGUMUSAN PENYELENGGARAAN BANGUNAN YANG EFEKTIF- Mohd Khair Anuar

18)     PEMBANGUNAN DAN PENGANALISISAN APLIKASI PERMOHONAN PERUNTUKKAN PENYELENGGARAAN BANGUNAN SEKOLAH BERASASKAN PROSES PENGURUSAN DALAM KEJURUTERAAN AWAM.- Shamsuddin , Sharifah Hamimah (2011)

19)  BUDAYA PENYELENGGARAAN KEMUDAHAN KOLEJ DI KALANGAN  MAHASISWA: KAJIAN KES DI KOLEJ MELATI, UNIVERSITI TEKNOLOGI MARA, SHAH ALAM- Fairus Muhamad Darus

20)  FEASIBILITY STUDY ON THE USAGE OF NATURAL GAS FOR ELECTRICITY SUPPLY AT UNIVERSITI MALAYSIA PAHANG GAMBANG CAMPUS- Muhammad Zulhilmi, Mohd Ithnin (2012)

21)  JURNAL REKABENTUK DAN BINAAN

22)  BUILDING MANAGEMENT SYSTEM : A CASE STUDY AT ALBUKHARY FOUNDATION HEAD OFFICE - Abdul Rahman, Mohd. Rizal (2010)

23)  TAHAP KEBERKESANAN PENGURUSAN PENYENGGARAAN FASILITI BANGUNAN DI SEKTOR AWAM MALAYSIA - Mat Deris, Mohd. Sabri (2007)

No comments:

Post a Comment